Skip to content

Havis Rugged Phone Case for Samsung Galaxy S24 & S25

by Havis
SKU PD-A-1000-CGS24S25
Original price $50.00 - Original price $50.00
Original price $50.00
$50.00
$50.00 - $50.00
Current price $50.00

ABOUT THIS PRODUCT

Complete your Havis phone dock set up with the rugged phone case for Samsung Galaxy S24 & S25 in the Public Sector, Warehouse & Distribution, Energy & Utilities, Field Service, and other demanding environments
Robust case solution designed for consumer sized USB-C phones and used with PD-1001 (sold separately)
Input port on case allows device to be charged and transfer data when it's not in the Havis docking station
Full access to camera, speakers and controls
Rugged testing including Crash, Vibration, Thermal, Drop and Dock/Undocking
Compact and lightweight design
IP68 rated for demanding environments
Dual molded materials ensures strength, ruggedness and extreme temperature resistance
Rounded edges and corners for comfort and safety
Pair with Havis Phone Dock, Touch Screen Display and Keyboard for a mobile DeX solution. (Phone Dock, Touch Screen and Keyboard sold seperately)

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare