Skip to content

Package – Docking Station for Getac V120 with Advanced Port Replication, Getac Power Supply & Screen Support

by Havis
SKU PKG-DS-GTC-1605-BW
Original price $1,272.00 - Original price $1,272.00
Original price $1,272.00
$1,272.00
$1,272.00 - $1,272.00
Current price $1,272.00

ABOUT THIS PRODUCT

Supports Getac's V120 laptops in the Public Sector, Utility Services, Defense, Material Handling, and other demanding environments
Advanced port replication includes video capability as well as standard options to support mission-critical peripherals
Includes DS-DA-424 Screen Support, designed to support the laptop screen and reduce vibration
Spring-loaded, floating docking connector head ensures connectivity even through heavy vibration
Getac Power Supply Included (LPS-140-BW)
Compact & lightweight while being ultra rugged
Lock and key supplied for peace of mind theft deterrence
Integrated cable management system
Designed to fit all Havis and VESA 75-hole pattern mounting equipment, as well as most competitors
Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
Rounded edges and corners for comfort and safety
Made in USA

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare