Skip to content

Package – DS-TAB-401 Docking Station, TC-407 Tablet Case, and LPS-184 DC Power Supply for Samsung Tab Active4 Pro & Active5 Pro

by Havis
SKU PKG-TAB4-SAM1
Original price $1,020.00 - Original price $1,020.00
Original price $1,020.00
$1,020.00
$1,020.00 - $1,020.00
Current price $1,020.00

ABOUT THIS PRODUCT

Supports Samsung's Tab Active4 Pro and Active5 Pro in public safety, utility, and other demanding environments
LED power indicator
Full access to camera, speakers, and controls
Simple, safe and secure connectivity through one handed docking and undocking
Low profile, rugged design that is drop tested
Input port on case allows device to be charged and transfer data when it's not in the Havis docking station
Kickstand provides angled viewing
Integrated stylus holder
Input port on case allows device to be charged and transfer data when it's not in the Havis docking station
Hand Strap Included
Includes 96W DC Power Supply (LPS-184)
Integrated cable management system
Rounded edges and corners for comfort and safety
Keyed lock for added security
Made in USA

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare