Skip to content

Power Supply with Lighter Plug for use with DS-GTC-220, DS-GTC-610, DS-GTC-800, DS-GTC-900, DS-GTC-1000, DS-GTC-1100, DS-GTC-1200/1210, DS-GTC-1300 & DS-GTC-1400/1410 Series Docking Stations

by Havis
SKU LPS-140
Original price $238.00 - Original price $238.00
Original price $238.00
$238.00
$238.00 - $238.00
Current price $238.00

ABOUT THIS PRODUCT

Compatible Havis docking stations: DS-GTC-220 Series, DS-GTC-610 Series, DS-GTC-800 Series, DS-GTC-900 Series, DS-GTC-1000 Series, DS-GTC-1100 Series, DS-GTC-1200 Series, DS-GTC-1300 Series & DS-GTC-1400 Series
Compatible computers: Getac F110 rugged tablet, Getac S410 notebook, Getac A140 rugged tablet, Getac K120 convertible laptop & tablet, Getac UX10 tablet, Getac B360 and B360 Pro laptops, Getac ZX10 tablet, & Getac S510 laptops
Power supply includes: 120 watt Getac power supply, 36" output cable with 90 degree connector, 82" input cable with cigarette lighter adapter
LPS-208 accessory bracket for panel mounting also included
Optional accessory LPS-211 required for mounting to the left or right hand side of the docking station sold separately
Some applications will require power supply with LPS-211 to be mounted to the side of tilt swivel for improved clearance

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare