Skip to content

Package – Docking Station for Getac V120 with Standard Port Replication, Getac Power Supply, Screen Support, and Power Supply Mounting Bracket

by Havis
SKU PKG-DS-GTC-1607-BW
Original price $1,209.00 - Original price $1,209.00
Original price $1,209.00
$1,209.00
$1,209.00 - $1,209.00
Current price $1,209.00

ABOUT THIS PRODUCT

Supports Getac's V120 laptops in the Public Sector, Utility Services, Defense, Material Handling, and other demanding environments
Includes standard port replication to connect multiple mission-critical peripherals
Includes DS-DA-424 Screen Support, designed to support the laptop screen and reduce vibration
Includes LPS-211 accessory bracket for mounting the power supply directly to the docking station
Spring-loaded, floating docking connector head ensures connectivity even through heavy vibration
Getac Power Supply Included (LPS-140-BW)
Compact & lightweight while being ultra rugged
Lock and key supplied for peace of mind theft deterrence
Integrated cable management system
Designed to fit all Havis and VESA 75-hole pattern mounting equipment, as well as most competitors
Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
Rounded edges and corners for comfort and safety
Made in USA

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare