Skip to content

SHIELD MegaGo 2 Rapid Deployment Portable Case - AT&T

SKU M4D-UC-G03
Original price $6,299.00 - Original price $6,299.00
Original price $6,299.00
$6,299.00
$6,299.00 - $6,299.00
Current price $6,299.00

ABOUT THIS PRODUCT

SHIELD MegaGo 2 is a portable solution for the SHIELD MegaFi 2 high power 5G mobile router for AT&T and FirstNet networks. With MegaGo 2, first responders have the rapid deployment and portability they need to take 5G MegaRange technology with them and have the most reliable on-scene FirstNet broadband communications wherever they go.

The SHIELD MegaGo 2 case includes the SHIELD MegaFi 2 high power 5G mobile router for AT&T and FirstNet networks, allowing first responders and enterprises to bring HPUE performance with them and stay connected wherever they go.

The system includes Nextivity patented High Power User Equipment (HPUE) technology, along with a rechargeable battery pack and integrated antennas – all in a rugged case. With only one control – the On/Off push button – MegaGo 2 provides a Wi-Fi bubble connection to the FirstNet network. This enables users to connect on scene via Wi-Fi for full access to all their applications.

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare