Skip to content

NSR-2166R: Multi-Purpose Work Light - Rechargeable

SKU NSR-2166R
Original price $90.58 - Original price $90.58
Original price $90.58
$90.58
$90.58 - $90.58
Current price $90.58

ABOUT THIS PRODUCT

This rechargeable all LED Work Light has both a spotlight and a floodlight built-in. The spotlight, located in the base of the handle, is rated at 40 Lumens. It’s perfect for putting a narrow beam of light into a specific area. The floodlight, rated at 250 lumens, is designed for lighting up a large area. The idea is simple, use the spotlight to find the problem, and the floodlight to light up the area when fixing the problem.
The work light has two magnets built-in...one at the balance point in the middle of the handle, and the other at the tip of the light. The flat-bottom design of the handle means the light will stand up on most flat surfaces, and the octagonal shape of the handle keeps the floodlight aimed in the correct direction when you lay the light on its side.
Further adding to the work light’s hands-free features is the detachable magnetic hook. It can be attached to either integrated body magnet and rotated 360 degrees. The integrated Nickel Metal Hydride battery can be recharged with the included AC or DC power supply/charger.

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare