Skip to content

Power Supply (with ferrite bead for in-vehicle EMI suppression) for use with DS-DELL-100, 110, 200, 210, 220, 230, 300, 410, & 420 Series, & DS-GD-300 Series Docking Stations

by Havis
SKU LPS-137
Original price $286.00 - Original price $286.00
Original price $286.00
$286.00
$286.00 - $286.00
Current price $286.00

ABOUT THIS PRODUCT

Compatible Havis docking stations: DS-DELL-100, 110, 200, 210, 220, 230, 300, 400, 410, & 420 Series and DS-GD-300 Series
Compatible computers: Dell Latitude E6400/E6410/E6420/E6430 ATG, E6400/E6410/E6420 XFR, XT2 XFR, Dell Latitude Rugged 14" & 12" Notebooks/2in1 (5414, 7414, 7214, 5420, 5424, 7424), Dell Latitude Rugged Notebooks 5420, 5424 , 7424 and General Dynamics GD4000
Power supply kit includes: 90 W LIND power supply, 41" output power cable with ferrite bead for EMI suppression and plug-in connector, 6' input cable with cigarette lighter adapter, and mounting hardware
Due to differences in the input power connectors, the LPS-137 cannot be connected directly to either the Latitude 5430 Rugged Laptop or the Latitude 7330 Rugged Extreme Laptop

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare