Skip to content

SLR-2120: Emergency Area Light / Under Hood Work Light - Rechargeable

SKU SLR-2120
Original price $213.12 - Original price $213.12
Original price $213.12
$213.12
$213.12 - $213.12
Current price $213.12

ABOUT THIS PRODUCT

The SLR-2120 Emergency Area Light / Under Hood Work Light, is an all LED, hands-free floodlight. This rechargeable work light has an adjustable cradle with a pair of spring-loaded, foam-covered grippers that will extend 48”-70” to attach to a large variety of surfaces including the underside of most automobile hoods. The light bar can then be rotated 360 degrees to place the lighting exactly where it’s needed.
The SLR-2120 has two brightness modes: Full-power (1200 Lumens) and Half-power (650 Lumens). The dual on/off buttons, one located on each of the two handles, operate in tandem with each other. One press of either button turns the light on in Full-power Mode, a second press and you’re in Half-power Mode and then a third press turns the light off. The light bar can easily be removed from the cradle.
Each of the handles can independently rotate up or down through more than 200 degrees range of motion. The flat surface at the end of each handle can serve as a stand for the light bar. Additionally, there are 3 flush-mounted magnets located at the end of each handle. This allows one or both ends of the light bar to be attached to virtually any flat metal surface. Each handle also has an integrated recessed hook that can swivel 360 degrees making it possible to hang the light bar up.
The included AC & DC Power Supplies/Chargers can be used to power the SLR-2120 during use and/or as a way to recharge the unit when it’s not in use. Requiring only 6 hours to charge the SLR-2120 will run for 4.5 hours in Full-power Mode and 8.5 hours when operating in Half-power mode.

SHIPPING & LEAD TIMES

Important: Expedited shipping options affect transit time after shipment only and do not guarantee same-day or next-day shipping.

Typical Lead Times (if not in stock):

  • Computers & Tablets: Many configurations ship in 2-5+ weeks; specialized or rugged systems may take longer.
  • Routers, Connectivity & Radio Equipment: Most items ship in 1-4+ weeks; programmed or specialized units may take longer.
  • Emergency Lighting: Standard lights and components typically ship in 1-3+ weeks; vehicle-specific lighting solutions may take 2-5+ weeks.
  • In-Car Video: Specialized in-car video equipment and accessories usually ship in 3-6+ weeks
  • Video Equipment: Cameras, monitors, and recorders usually ship in 1-3+ weeks; analytics or access control solutions may take longer.
  • Vehicle Equipment & Accessories: Universal hardware: 1-2+ weeks; Vehicle-specific or complex assemblies: 2-4+ weeks
  • Docking Stations & Power Management: Basic docks ship in 2-3+ weeks; port-replicated or integrated systems may require 3-5+ weeks.

Lead times are estimates and may vary based on configuration, manufacturer availability, and order volume. Contact us before ordering if timing is critical.

Some products may require government-issued ID or agency credentials prior to fulfillment.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare